<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Raleigh greenway update: From House Creek to Portland	</title>
	<atom:link href="https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/feed/" rel="self" type="application/rss+xml" />
	<link>https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=raleigh-greenway-update-from-house-creek-to-portland</link>
	<description>Explore the outdoors, discover yourself.</description>
	<lastBuildDate>Mon, 02 Apr 2012 18:32:11 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>
	<item>
		<title>
		By: JoeMiller		</title>
		<link>https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33467</link>

		<dc:creator><![CDATA[JoeMiller]]></dc:creator>
		<pubDate>Mon, 02 Apr 2012 18:32:11 +0000</pubDate>
		<guid isPermaLink="false">http://www.getgoingnc.com/?p=1975#comment-33467</guid>

					<description><![CDATA[In reply to &lt;a href=&quot;https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33466&quot;&gt;Bob Woodson&lt;/a&gt;.

The latest projection is June. A full update on House Creek and the Neuse River Trail tk.]]></description>
			<content:encoded><![CDATA[<p>In reply to <a href="https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33466">Bob Woodson</a>.</p>
<p>The latest projection is June. A full update on House Creek and the Neuse River Trail tk.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Bob Woodson		</title>
		<link>https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33466</link>

		<dc:creator><![CDATA[Bob Woodson]]></dc:creator>
		<pubDate>Sun, 01 Apr 2012 18:20:43 +0000</pubDate>
		<guid isPermaLink="false">http://www.getgoingnc.com/?p=1975#comment-33466</guid>

					<description><![CDATA[When will ythe House Creek Greenway be completed? Still closed at  Glen Eden tunnel even though it looks like  most of construction is completged.]]></description>
			<content:encoded><![CDATA[<p>When will ythe House Creek Greenway be completed? Still closed at  Glen Eden tunnel even though it looks like  most of construction is completged.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: John Royal		</title>
		<link>https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33245</link>

		<dc:creator><![CDATA[John Royal]]></dc:creator>
		<pubDate>Tue, 29 Nov 2011 21:33:14 +0000</pubDate>
		<guid isPermaLink="false">http://www.getgoingnc.com/?p=1975#comment-33245</guid>

					<description><![CDATA[I&#039;m excited about the new House Creek greenway but like Curt W. I am baffled at some of the planning decisions that were made.  

I check on the greenway progress at least once a week as I will be a frequent user of it once it is complete.  Substantial progress seems to have been made in the middle but, as of the end of November, the Contractor hasn&#039;t even started on the connection between the new and old trail at Meredith (looks almost like a bridge will be required there), or on the median on Blue Ridge that Joe Miller referred to.  I really hope everything will be done by Spring when I start bike commuting to work again.]]></description>
			<content:encoded><![CDATA[<p>I&#8217;m excited about the new House Creek greenway but like Curt W. I am baffled at some of the planning decisions that were made.  </p>
<p>I check on the greenway progress at least once a week as I will be a frequent user of it once it is complete.  Substantial progress seems to have been made in the middle but, as of the end of November, the Contractor hasn&#8217;t even started on the connection between the new and old trail at Meredith (looks almost like a bridge will be required there), or on the median on Blue Ridge that Joe Miller referred to.  I really hope everything will be done by Spring when I start bike commuting to work again.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: JoeMiller		</title>
		<link>https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33125</link>

		<dc:creator><![CDATA[JoeMiller]]></dc:creator>
		<pubDate>Wed, 14 Sep 2011 22:21:39 +0000</pubDate>
		<guid isPermaLink="false">http://www.getgoingnc.com/?p=1975#comment-33125</guid>

					<description><![CDATA[In reply to &lt;a href=&quot;https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33119&quot;&gt;Curt W.&lt;/a&gt;.

Not sure about the tunnel. The Blue Ridge crossing isn&#039;t the best situation, but here&#039;s what they&#039;ve done to mitigate danger: You&#039;ll cross one lane and enter an island in the median at one end; then you&#039;ll move down the island, exit the far end cross the remaining lane. Sight lines are pretty good there: should be able to see traffic for an adequate distance.]]></description>
			<content:encoded><![CDATA[<p>In reply to <a href="https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33119">Curt W.</a>.</p>
<p>Not sure about the tunnel. The Blue Ridge crossing isn&#8217;t the best situation, but here&#8217;s what they&#8217;ve done to mitigate danger: You&#8217;ll cross one lane and enter an island in the median at one end; then you&#8217;ll move down the island, exit the far end cross the remaining lane. Sight lines are pretty good there: should be able to see traffic for an adequate distance.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Curt W.		</title>
		<link>https://getgoingnc.com/2011/02/raleigh-greenway-update-from-house-creek-to-portland/comment-page-1/#comment-33119</link>

		<dc:creator><![CDATA[Curt W.]]></dc:creator>
		<pubDate>Wed, 14 Sep 2011 02:11:31 +0000</pubDate>
		<guid isPermaLink="false">http://www.getgoingnc.com/?p=1975#comment-33119</guid>

					<description><![CDATA[Well its Sept. 13, 2011 and the Glen Eden Dr. Tunnel is still closed. Closed since Aug 1st and planned to open the street on Sept. 9 but no luck yet. They have built a tunnel but it seems to go nowhere as the trail abruptly ends at tunnels end.  Maybe topography was the issue but this tunnel seems to be over the top as a means to cross a street. Over at Blue Ridge and Crabtree Blvd it looks like a simple surface intersection crossing.
That doesn&#039;t seem to be safe as it is congested especially. 
with bus traffic.
What&#039;s the point of an unnecessary tunnel  where traffic is lighter than crossing a busy intersection on the surface?   

Planning seems inefficient but what&#039;s done is done.]]></description>
			<content:encoded><![CDATA[<p>Well its Sept. 13, 2011 and the Glen Eden Dr. Tunnel is still closed. Closed since Aug 1st and planned to open the street on Sept. 9 but no luck yet. They have built a tunnel but it seems to go nowhere as the trail abruptly ends at tunnels end.  Maybe topography was the issue but this tunnel seems to be over the top as a means to cross a street. Over at Blue Ridge and Crabtree Blvd it looks like a simple surface intersection crossing.<br />
That doesn&#8217;t seem to be safe as it is congested especially.<br />
with bus traffic.<br />
What&#8217;s the point of an unnecessary tunnel  where traffic is lighter than crossing a busy intersection on the surface?   </p>
<p>Planning seems inefficient but what&#8217;s done is done.</p>