<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Triangle close to 50 miles of connected greenway	</title>
	<atom:link href="https://getgoingnc.com/2011/03/triangle-close-to-50-miles-of-connected-greenway/feed/" rel="self" type="application/rss+xml" />
	<link>https://getgoingnc.com/2011/03/triangle-close-to-50-miles-of-connected-greenway/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=triangle-close-to-50-miles-of-connected-greenway</link>
	<description>Explore the outdoors, discover yourself.</description>
	<lastBuildDate>Mon, 04 Apr 2011 15:36:23 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>
	<item>
		<title>
		By: East Coast Greenway Alliance moves in to help N.C. move on&#160;&#124;&#160;GetGoing NC!		</title>
		<link>https://getgoingnc.com/2011/03/triangle-close-to-50-miles-of-connected-greenway/comment-page-1/#comment-22895</link>

		<dc:creator><![CDATA[East Coast Greenway Alliance moves in to help N.C. move on&#160;&#124;&#160;GetGoing NC!]]></dc:creator>
		<pubDate>Mon, 04 Apr 2011 15:36:23 +0000</pubDate>
		<guid isPermaLink="false">http://www.getgoingnc.com/?p=2083#comment-22895</guid>

					<description><![CDATA[[...] Raleigh (Reedy Creek, House Creek, Walnut Creek and the Neuse River greenways, which should be one continuous stretch within a couple of years) to the Johnston County line. In the long term, however, the ECG hopes to piggyback on the proposed [...]]]></description>
			<content:encoded><![CDATA[<p>[&#8230;] Raleigh (Reedy Creek, House Creek, Walnut Creek and the Neuse River greenways, which should be one continuous stretch within a couple of years) to the Johnston County line. In the long term, however, the ECG hopes to piggyback on the proposed [&#8230;]</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Owen Evans		</title>
		<link>https://getgoingnc.com/2011/03/triangle-close-to-50-miles-of-connected-greenway/comment-page-1/#comment-20516</link>

		<dc:creator><![CDATA[Owen Evans]]></dc:creator>
		<pubDate>Mon, 21 Mar 2011 20:21:42 +0000</pubDate>
		<guid isPermaLink="false">http://www.getgoingnc.com/?p=2083#comment-20516</guid>

					<description><![CDATA[It looked like Cary was finally starting the work to install the pedestrian crossing signal at Maynard Road for the Black Creek Greenway. I would have preferred a tunnel but the signal at least makes the greenway passable.]]></description>
			<content:encoded><![CDATA[<p>It looked like Cary was finally starting the work to install the pedestrian crossing signal at Maynard Road for the Black Creek Greenway. I would have preferred a tunnel but the signal at least makes the greenway passable.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
