<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: House Creek Greenway: One tall boardwalk from finished	</title>
	<atom:link href="https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/feed/" rel="self" type="application/rss+xml" />
	<link>https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=house-creek-greenway-one-tall-boardwalk-from-finished</link>
	<description>Explore the outdoors, discover yourself.</description>
	<lastBuildDate>Sat, 18 Aug 2012 16:05:18 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>
	<item>
		<title>
		By: Shaun		</title>
		<link>https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33893</link>

		<dc:creator><![CDATA[Shaun]]></dc:creator>
		<pubDate>Sat, 18 Aug 2012 16:05:18 +0000</pubDate>
		<guid isPermaLink="false">http://getgoingnc.com/?p=4104#comment-33893</guid>

					<description><![CDATA[Is the trail,complete now?]]></description>
			<content:encoded><![CDATA[<p>Is the trail,complete now?</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: JoeMiller		</title>
		<link>https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33650</link>

		<dc:creator><![CDATA[JoeMiller]]></dc:creator>
		<pubDate>Mon, 25 Jun 2012 21:50:54 +0000</pubDate>
		<guid isPermaLink="false">http://getgoingnc.com/?p=4104#comment-33650</guid>

					<description><![CDATA[In reply to &lt;a href=&quot;https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33649&quot;&gt;Rob E.&lt;/a&gt;.

I&#039;ll ask, Rob. (That — or something along those lines — was my understanding as well.]]></description>
			<content:encoded><![CDATA[<p>In reply to <a href="https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33649">Rob E.</a>.</p>
<p>I&#8217;ll ask, Rob. (That — or something along those lines — was my understanding as well.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Rob E.		</title>
		<link>https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33649</link>

		<dc:creator><![CDATA[Rob E.]]></dc:creator>
		<pubDate>Mon, 25 Jun 2012 14:08:49 +0000</pubDate>
		<guid isPermaLink="false">http://getgoingnc.com/?p=4104#comment-33649</guid>

					<description><![CDATA[In reply to &lt;a href=&quot;https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33647&quot;&gt;JoeMiller&lt;/a&gt;.

Thanks for keeping up with this, Joe. If you get a chance to talk to Vic, there&#039;s one more thing I&#039;d love to hear about: The Meredith gate for the greenway overpass bridge. My understanding was that Meredith was going to relocate their gate to the Wade Avenue underpass, so that when House Creek was open, the bridge would be accessible even when Meredith had locked up their campus. So far I see no signs that they are doing this, and it&#039;s change that seems like it wouldn&#039;t be dependent on the completion of House Creek. In fact, I think the Wade Avenue connector is completed, so people could benefit from this change immediately if it were implemented.]]></description>
			<content:encoded><![CDATA[<p>In reply to <a href="https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33647">JoeMiller</a>.</p>
<p>Thanks for keeping up with this, Joe. If you get a chance to talk to Vic, there&#8217;s one more thing I&#8217;d love to hear about: The Meredith gate for the greenway overpass bridge. My understanding was that Meredith was going to relocate their gate to the Wade Avenue underpass, so that when House Creek was open, the bridge would be accessible even when Meredith had locked up their campus. So far I see no signs that they are doing this, and it&#8217;s change that seems like it wouldn&#8217;t be dependent on the completion of House Creek. In fact, I think the Wade Avenue connector is completed, so people could benefit from this change immediately if it were implemented.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: JoeMiller		</title>
		<link>https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33647</link>

		<dc:creator><![CDATA[JoeMiller]]></dc:creator>
		<pubDate>Fri, 22 Jun 2012 11:16:42 +0000</pubDate>
		<guid isPermaLink="false">http://getgoingnc.com/?p=4104#comment-33647</guid>

					<description><![CDATA[In reply to &lt;a href=&quot;https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33646&quot;&gt;Rob E.&lt;/a&gt;.

I have a call in to Vic Lebsock on this. Hope to report back today. Thanks for the update, Rob.]]></description>
			<content:encoded><![CDATA[<p>In reply to <a href="https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33646">Rob E.</a>.</p>
<p>I have a call in to Vic Lebsock on this. Hope to report back today. Thanks for the update, Rob.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Rob E.		</title>
		<link>https://getgoingnc.com/2012/05/house-creek-greenway-one-tall-boardwalk-from-finished/comment-page-1/#comment-33646</link>

		<dc:creator><![CDATA[Rob E.]]></dc:creator>
		<pubDate>Thu, 21 Jun 2012 15:18:06 +0000</pubDate>
		<guid isPermaLink="false">http://getgoingnc.com/?p=4104#comment-33646</guid>

					<description><![CDATA[Rode by the Wade Ave. end yesterday and saw, for the first time, a pile of building materials for the boardwalk (presumably). Apart from some large poles that have been in place for a while now, this is the first sign of progress I&#039;ve seen on that last stretch. It&#039;s encouraging because it does mean things are moving forward, but obviously Memorial Day has come and gone, and June 25th no longer seems likely, unless those boardwalks go up a lot faster than I think they do (and really I have no idea). Raleigh&#039;s website still says end of June, but I do believe &quot;late July&quot; was mentioned recently.]]></description>
			<content:encoded><![CDATA[<p>Rode by the Wade Ave. end yesterday and saw, for the first time, a pile of building materials for the boardwalk (presumably). Apart from some large poles that have been in place for a while now, this is the first sign of progress I&#8217;ve seen on that last stretch. It&#8217;s encouraging because it does mean things are moving forward, but obviously Memorial Day has come and gone, and June 25th no longer seems likely, unless those boardwalks go up a lot faster than I think they do (and really I have no idea). Raleigh&#8217;s website still says end of June, but I do believe &#8220;late July&#8221; was mentioned recently.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
