Tag Archives: House Creek Greenway

Triangle close to 50 miles of connected greenway

The Triangle’s greenway system is a tiny step closer to becoming a complete network.

Joe Godfrey, parks planner with the Town of Cary, tells GGNC that a 1.3-mile missing link of the Black Creek Greenway should be finished mid-April. The stretch would extend the existing 5.6 miles of Black Creek Greenway running south from Lake Crabtree to Chapel Hill Road on to Maynard Road. A short stretch of the sidewalk/greenway will run alongside Maynard before it crosses High House Road. From there, Godfrey says another short missing link should begin construction soon and will link with existing greenway into the heart of Bond Park. read more

New signs give Raleigh greenways direction

I pulled over on the greenway and stared at the sign, puzzled. Puzzled not by the sign’s message, which was clear. Puzzled by its mere existence.

For years, the Triangle’s greenways consisted of strings of half-mile and mile-long bits of elbow macaroni, scattered about. Signs — signs showing you where you were and where you could go — weren’t a priority on a path that simply went from Point A to Point B. But as those greenways grew and those bits of elbow macaroni joined to form longer and interconnected noodles, the need for direction, for signs, increased. For the past decade or so, the main complaint about local greenways has been the absence of signs. read more

First 8 miles of paved Neuse Greenway to open this summer

For years, Raleigh’s Neuse River Greenway consisted of a three-and-a-half-mile stretch of dirt trail from Old Milburnie Road just above U.S. 64 downstream to Anderson Point. Raleigh’s greenway master plan called for paved greenway running from just below the Falls Lake dam to the Johnston County line, and the topic would occasionally come up in greenway discussions, but it wasn’t a priority with the city. read more

Raleigh greenway update: From House Creek to Portland

Several of you have inquired about the status of Raleigh’s House Creek Greenway. At not quite 3 miles, the greatly anticipated House Creek Greenway is of far more significance than it’s length might suggest: When House Creek is completed, it will link the nearly 10-mile* Reedy Creek/Gorman/Rocky Branch greenway with the 11.7-mile Crabtree Creek Trail greenway. I’ll get to what exactly all that means in a sec. First, the answer to your question. read more