Tag Archives: Raleigh

House Creek Greenway: One tall boardwalk from finished

How close is Raleigh’s long-awaited House Creek Greenway from being completed?

One really tall boardwalk.

Rather than words, we’ll take you on a ride so you can get a feel for the greenway and just how close it is to being done. The one really tall boardwalk is at the very south end of the new greenway, where House Creek connects with Raleigh’s Reedy Creek Greenway. read more

Talked out? It’s time to reconsider the Crabtree/Umstead connector

The greenway along Crabtree Creek is great. A parallel paddle trail would make it even better.

Of our recent greenway coverage (see below), Bob writes: “Great overview! The only section I didn’t see mentioned this week is the missing link of the Crabtree greenway between Lindsay Drive and Umstead. Any good news on this one?”

I asked Sig Hutchinson about this stretch last week. Sig, as many of you may know, is the Triangle’s go-to guy when it comes to making trails happen. Back in the 1990s, he was the driving force behind getting mountain bike trails established at the Beaverdam area of Falls Lake. He moved on to become president of the Triangle Greenways Council, pushing greenway development throughout the Triangle. More recently, he’s been the chairman of the Wake County Open Space and Parks Advisory Committee, spearheading 2007’s successful $50 million Wake County open space bond referendum. Whenever there’s a snag in trail and greenway development, Sig usually is brought in to unsnag things. Such is the case with the aforementioned stretch of the Crabtree Creek Trail. read more

A greenway-connected Triangle

Oh, the places you'll go on the Triangle's greenways come 2014.

For the past week, we’ve been looking at the current explosive growth of the Raleigh greenway system: $35 million to add about 45 miles of greenway. By 2014, Raleigh should have about 116 miles of greenway, with new, vital links along the Neuse River, Crabtree Creek, Walnut Creek, House Creek and Honeycutt Creek. read more

Raleigh’s greenway system: 2014 and beyond

The Neuse River Trail: Backbone of Raleigh's greenway system.

Within two years, here’s how your day on the Raleigh greenways might look.

You start out on a bike ride at Lake Johnson. Park at the boathouse and take a leisurely (except for the hills on the lake’s south side) lap around the lake before heading down Walnut Creek through N.C. State’s Centennial Campus taking note of all the new construction. Stop at the Farmer’s Market to see if the strawberries are in yet, then continue downstream on some of Raleigh’s oldest greenway. Pass the abandoned E.B. Bain water treatment plant, swing by the Walnut Creek Wetland Center, pass through Worthdale and Walnut Creek parks and head on down to the Neuse River. read more

House Creek Greenway to open June 25 (read: Memorial Day)

This stretch under Lake Boone Trail is finished; only two paving projects remain on the House Creek Greenway.

If you’ve been driving Raleigh’s Beltline between Wade Avenue and Glen Eden Drive, sneaking peeks into the woods and wondering when on earth the House Creek Greenway is going to open, the answer is June 25.

That’s the official answer. In reality, it should be passable by Memorial Day. read more